Bibliography: 1. Lomonosov G. G. Proizvodstvennye protsessy podzemnoy razrabotki rudnykh mestorozhdeniy: monografiya [Production processes in underground ore mining, monograph], Moscow, Izd-vo «Gornaya kniga», 2013, 512 p.
2. Gromov E. V., Bilin A. L., Belogorodtsev O. V., Nagovitsyn G. O. Substantiation of the type and parameters of mining and transport systems in the development of ore deposits in the conditions of the Kola Peninsula. Fiziko-tekhnicheskiye problemy razrabotki poleznykh iskopayemykh. 2018, no. 4, pp. 70—78.
3. Lukichev S. V., Nagovitsyn O. V., Ilin E. A., Rudin R. S. Digital mining engineering technologies are the first step towards creating a «smart» mining production. Gornyi Zhurnal. 2018, no. 7, pp. 86—90. [In Russ]. DOI: 10.17580/gzh.2018.07.17.
4. Laptev V. V. Numerical modeling of the flow of crushed rock mass in the process of ore extraction using the ROCKY DEM program. Vestnik Murmanskogo Gosudarstvennogo Tekhnicheskogo Universiteta. 2019, vol. 22, no. 1, pp. 149–157. [In Russ]. DOI: 10.21443/15609278-2019-22-1-149-157.
5. Zhuravlev A. G., Skorokhodov A. V.. Modeling of parameters for transport systems in deep open-pits. MIAB. Mining Inf. Anal. Bull. 2015, no. S56, pp. 336—349. [In Russ].
6. Malyhanov A. A., Chernenko V. E. From simulation models to digital twins: analysis of industrial projects experience. Trudy Devyatoy Vserossiyskoy nauchno-prakticheskoy konferentsii po imitatsionnomu modelirovaniyu i ego primeneniyu v nauke i promyshlennosti [Proceedings of ninth all-russian scientific and practical conference on simulation modeling and its applications in science and industry], Ekaterinburg, 2019, pp. 37—46. [In Russ].
7. Newman C., Newman D., Dupuy R. Development of a multiple level underground limestone mine from geology through mine planning. International Journal of Mining Science and Technology. 2020, vol. 30, no. 1, pp. 63–67. DOI: 10.1016/j.ijmst.2019.12.007.
8. Valuev A. M. Problem of pareto optimization of a trajectory on a network as a metamodel of multiobjective choice of project parameters for mining enterprises. MIAB. Mining Inf. Anal. Bull. 2015, no. 11, pp. 215—223. [In Russ].
9. Lukichev S. V., Nagovitsyn O. V. Digital simulation in solving problems of surface and underground mining technologies. Gornyi Zhurnal. 2019, no. 6, pp. 51—55. [In Russ]. DOI: 10.17580/gzh.2019.06.06.
10. Lukichev S. V., Nagovitsyn O. V., Bilin A. L., Belogorodtsev O. V., Rybin V. V., Gromov E. V., Lyubin A. N., Kornienko A. V., Gurin K. P., Nagovitsyn G. O., Laptev V. V., Toropov D. A. Nauchnye i prakticheskie aspekty primeneniya tsifrovykh tekhnologiy v gornoy promyshlennosti: monografiya [Scientific and practical aspects of the application of digital technologies in mining], Apatity: Izd-vo FITS KNTS RAN, 2019, 192 p.
11. Manríquez F., Pérez J., Morales N. A simulation–optimization framework for short-term underground mine production scheduling. Optimization and Engineering. 2020, no. 21, pp. 939– 971. DOI 10.1007/s11081-020-09496-w.
12. Karami A., Szymanski J. A simulation model of an underground mine haulage system. Mineral Resources Engineering. 1997, no. 06, pp. 229—238.
13. Lukichev S. V., Nagovitsin O. V. Digital transformation of mining industry: past, present and future. Gornyi Zhurnal. 2020, no. 9, pp. 13—18. [In Russ]. DOI: 10.17580/gzh.2020. 09.01.
14. Vásquez J., Morales N., Cornejo J. Optimization of mining planning in block / Panel caving mines including development activities. Proceedings of the 38th International Symposium on the Application of Computers and Operations Research in the Mineral Industry (APCOM 2017), USA, 2017, pp. 16.1—16.8.
15. Bardziński P. J., Król R., Jurdziak L. P. Empirical model of discretized copper ore flow within the underground mine transport system. International Journal of Simulation Modelling. 2019, vol. 18, no. 3, pp. 279—289.
16. Nagovitsyn G. O., Bilin A. L., Zvonareva S. V. The advanced MGIS MINEFRAME possibilities for technological and monetary calculation of transport expenditures. MIAB. Mining Inf. Anal. Bull. 2019. Special edition 37, pp. 241—248. DOI: 10.25018/0236-1493-2019-1137-241-248.
17. Dijkstra E. W. A note on two problems in connexion with graphs. Numerische Mathematik. 1959, vol. 1, no. 1, pp. 269—271. DOI: 10.1007/BF01386390.
18. Levitin A. V. Algoritmy. Vvedenie v razrabotku i analiz [Introduction to development and analysis], Мoscow, Williams, 2006, 576 p.
19. Lukichev S. V., Nagovitsyn O. V., Laptev V. V. Digital tools for underground mine planning: Cut-and-fill mining. Eurasian Mining. 2021, no. 1, pp. 75—78.