Production indicators and equipment of the Muruntau quarry and the largest copper and gold ore quarries in the world

This paper presents a review of production indicators and the main mining equipment used at the world’s largest copper and gold open-pit mines. An analysis is carried out of the composition of the fleets of primary mining equipment by process (drilling rigs, excavators and haul trucks) and of the open-pit mining technologies employed at the largest copper and gold pits worldwide. For the mines considered, the following equipment parameters and performance indicators are summarized: average excavator bucket capacity, average payload of haul trucks, average number of haul trucks and drilling rigs per excavator, total excavator bucket capacity and total haul truck payload at each operation, and the mean annual excavator capacity per 1 m3 of bucket capacity. The relationship between average annual excavator capacity and bucket capacity variation is presented. With respect to the equipment fleets of the enterprises examined, the most commonly used models of haul trucks and excavators are identified by make and manufacturer. The obtained data are compared with the actual performance figures of the Muruntau gold operation. Plans of the enterprise to increase production capacity in order to achieve record gold-ore production at the Muruntau open-pit are also described.

Keywords: open-pit mine, copper, gold, Muruntau mine, production indicators, ore production volume, volume of overburden removal, mining equipment, equipment capacity, drilling rig, excavator, haul truck.
For citation:

Umarov F. Ya., Nutfulloev G. S., Yuldoshev U. U., Levchenko Ya. V., Pastikhin D. V., Kobilov Sh. B. Production indicators and equipment of the Muruntau quarry and the largest copper and gold ore quarries in the world. MIAB. Mining Inf. Anal. Bull. 2026;(7):32-48. [In Russ]. DOI: 10.25018/0236_1493_2026_7_0_32.

Acknowledgements:
Issue number: 7
Year: 2026
Page number: 32-48
ISBN: 0236-1493
UDK: 622.2+622.34
DOI: 10.25018/0236_1493_2026_7_0_32
Article receipt date: 27.03.2026
Date of review receipt: 27.04.2026
Date of the editorial board′s decision on the article′s publishing: 10.06.2026
About authors:

F.Ya. Umarov1, Dr. Sci. (Eng.), Professor, Director, e-mail: farkhodbek.umarov@yandex.ru, ORCID ID: 0000-0002-02910-9806,
G.S. Nutfulloev1, Dr. Sci. (Eng.), Associate Professor, Head of the Administrative Department, e-mail: gafurcom@mail.ru, ORCID ID: 0009-0004-0241-1273,
U.U. Yuldoshev, Head of the Strategic Mine Planning Department, NMMC JSC, Navoi, 210100, Republic of Uzbekistan, e-mail: uu.yuldoshev@gmail.com, ORCID ID: 0009-0007-7323-2186,
Ya.V. Levchenko2, Cand. Sci. (Eng.), Assistant Professor, e-mail: levchenko.mggu@mail.ru, ORCID ID: 0000-0002-2080-6330,
D.V. Pastikhin2, Cand. Sci. (Eng.), Assistant Professor, e-mail: msmu-opm@mail.ru, ORCID ID: 0009-0000-7386-6831,
Sh.B. Kobilov1, Doctor of Philosophy (PhD) in Technical Sciences, Deputy Dean of the Mining and Metallurgical Faculty, e-mail: sheraliqobilov492@gmail.com, ORCID ID: 0009-0008-5912-1735,
1 Almalyk Branch of NUST MISIS, 110100, Almalyk, Republic of Uzbekistan,
2 NUST MISIS, 119049, Moscow, Russia.

 

For contacts:

Ya.V. Levchenko, e-mail: levchenko.mggu@mail.ru.

Bibliography:

1. Sillitoe R. H. Porphyry copper systems. Economic Geology. 2010, vol. 105, no. 1, pp. 3—41. DOI: 10.2113/gsecongeo.105.1.3.

2. Juan Daniel Yacolca Tejada Geología y tratamiento metalúrgico de unidad minera Cerro Verde: Resumen. Universidad Nacional Mayor de San Marcos, 2024. DOI: 10.13140/RG.2.2.24842.24000.

3. Preece R. K., Carlos Delgado Robles, Salazar A. Geometallurgical modeling of the escondida deposit. Mining, Metallurgy & Exploration. 2023, vol. 40, pp. 1585—1619. DOI: 10.1007/s42461-023-00836-9.

4. Montiel L., Dimitrakopoulos R. Stochastic mine production scheduling with multiple processes: application at Escondida Norte, Chile. Journal of Mining Sciences. 2013, no. 4, pp. 83—98. [In Russ].

5. Silkin A. A., Urzhumov A. G., Rudnev S. V., Ravshanov A. F. Development of Muruntau-Myutenbai joint open pit mine. Gornyi Zhurnal. 2021, no. 3, pp. 66—71. [In Russ]. DOI: 10.17580/gzh.2021.03.01.

6. Khamroev I. O. Gold reserves of the Navoi mining and metallurgical combinat. Gornyi Zhurnal. 2018, no. 9, pp. 22—32. [In Russ]. DOI: 10.17580/gzh.2018.09.01.

7. Korobovsky N. V., Rakhmatov S. N., Pazylov T. Sh, Kurmanaliev K. Z. Analysis of economy and signs of value, mining rent of the Kumtor gold mine project. Economics and innovation management. 2024, no. 2 (29), pp. 35—46. [In Russ]. DOI: 10.26730/2587-5574-2024-2-35-46.

8. Pazylov T. Sh., Rakhmatov S. N., Korobovsky N. V., Kurmanaliev K. Z. Kumtor mine development parameters. The Herald of KSTU. 2024, no. 2 (70), pp. 485—490. [In Russ]. DOI: 10.56634/16948335.2024.2.485—490.

9. Dromundo O., Robles S., Bissig T., Flores C., del Carmen Alfaro M., Cardona L. Chapter 19: The Peñasquito Gold-(Silver-Lead-Zinc) Deposit, Zacatecas, Mexico. Geology of the World's Major Gold Deposits and Provinces. Society of Economic Geologists, 2020. DOI: 10.5382/sp.23.19.

10. Zhuravlev A. G., Cherepanov V. A., Karpov V. A., Nevezhin A. Yu. Recommendations on operation and improvement in the quality of in-pit road maintenance at the Olympiadinsky and Blagodatny mining and processing plants. Russian Mining Industry Journal. 2023, no. 5, pp. 88—95. [In Russ]. DOI: 10.30686/1609-9192-2023-5-88-95.

11. Kuznetsov D. V., Kosolapov A. I. The validation of the pit mine technical system parameters for the Olympiadinskiy gold ore deposit mining. Minerals and Mining Engineering. 2019, no. 4, pp. 5—11. [In Russ]. DOI: 10.21440/0536-1028-2019-4-5-11.

12. Lifar-Laptev A. A. Review of the current state of mining of the Yenisei range and analysis of proposed solutions for the strategic development of mine. International Research Journal. 2025, no. 1 (151), pp. 1—16. [In Russ]. DOI: 10.60797/IRJ.2025.151.25.

13. Suprun V. I., Drebendshtedt K., Zelenin D. P., Radchenko S. A., Levchenko Ya. V., Yakutov A. V., Korchagina T. V. Gornaya geomorfologiya [Mining geomorphology], Moscow, Izd-vo «Gornaya kniga», 2023, 370 p.

14. Mahayasa M., Widijanto E., Yuniar A. T., Gautama R. The final result of slope Optimization program at Grasberg surface mine in Papua, Indonesia. MassMin 2020: Proceedings of the Eighth International Conference & Exhibition on Mass Mining, University of Chile, Santiago. 2020. pp. 1384—1394. DOI: 10.36487/ACG_repo/2063_104.

15. Srikant Annavarapu Geotechnical characterization and design for the transition from the Grasberg Open Pit to the Grasberg Block Cave mine. Rock Mechanics: Meeting Society's Challenges and Demands. 2007, pp. 1277—1286. DOI: 10.1201/NOE0415444019-c159.

16. Anistratov K. Yu., Donchenko T. V., Opanasenko P. I., Strogiy I. B. Analysis of the market of drill rigs for surface mining operations of the Russian mineral producers. Russian Mining Industry Journal. 2018, no. 2 (138), pp. 84—89. [In Russ]. DOI: 10.30686/1609-9192-2018-2-138-84-89.

17. Rubtsov S. K., Shlykov A. G., Malgin O. N., Zin'ko N. A, Fil V. I. Intensification of drilling processes at the quarries of the Navoi Mining and Metallurgical Combine. MIAB. Mining Inf. Anal. Bull. 2007. S5, pp. 119—127. [In Russ].

18. Bovin K. A., Gilev A. V., Shigin A. O., Kritsky D. Y. Industrial research of drilling equipment operating efficiency at Olimpiadinskiy GOK of AO «Polyus». Bulletin of the Kuzbass State Technical University. 2017, no. 3, pp. 87—93. [In Russ].

19. Anistratov K. Y. Analysis of the efficiency of using UZTM-KARTEX excavators in quarries. Russian Mining Industry Journal. 2019, no. 5 (147), pp. 20—24. [In Russ].

20. Mislibayev I. T., Makhmudov A. M.,  Makhmudov Sh. A. Theoretical generalization of modes and modeling of performance criteria of cutter–loaders.MIAB. Mining Inf. Anal. Bull. 2021, no. 1, pp. 102—110. [In Russ]. DOI: 10.25018/0236-1493-2021-1-0-102-110.

21. Donchenko T. V., Shibanov D. A., Yemelyanov A. A. IZ-KARTEX quarry excavators for the gold mining industry. Zoloto i tekhnologii. 2017, no. 4 (38), pp. 24—26. [In Russ].

22. Huayanca D., Bujaico G., Delgado A. Application of discrete-event simulation for truck fleet estimation at an open-pit copper mine in Peru. Applied Sciences. 2023, vol. 13, article 4093. DOI: 10.3390/app13074093.

23. Shemetov P. A. Features of the operation of mining and transport complexes during open-pit mining at the Muruntau deposit. MIAB. Mining Inf. Anal. Bull.  2005, no. 2, pp. 215—217. [In Russ].