Problems of ultimate pit limit design

The paper considers the problems of long-term stability of pit wall at the ultimate limits. The recommendations on drilling and blasting at the ultimate pit limits are based on geological studies, field engineering and geological exploration of structure and tectonics of rock mass, detection of unfavorably oriented weakening surfaces and on the pit wall stability estimates. The studies into adjacent rock mass deformation under multi-row short-delay blasting made it possible to develop the methods for improving the fragmentation quality of blasted rock mass by reducing the blast energy transmitted to pit wall rock mass, the calculation procedure of delay intervals between blasts and the blasting patterns for pit wall rock mass which ensured long-term stability of benches as a result of decreased explosive rupture of pit wall rock mass. At ultimate pit limits, the blast load applied to the pit wall rock mass can be reduced by using the diagonal blasting patterns and by increasing the delay intervals. To reduce the probability of pit wall failure, including the zone of permanent access roadways, it is recommended to operate at the ultimate pit limits based on the studies on rock mass structure with mapping the unfavorably oriented cracks and faults, pit wall stability estimates and adjustment of pit wall deign parameters.

Keywords: open-pit mine, rock mass, stability, adjacent rock mass, drilling-and-blasting, short-delayed blasting, delay interval, blasting pattern and sequence, pit wall rock mass fracture.
For citation:

Yakovlev A. V., Shimkiv E. S. Problems of ultimate pit limit design. MIAB. Mining Inf. Anal. Bull. 2021;(5—1):105—116. [In Russ]. DOI: 10.25018/0236_1493_2021_51_0_105.

Acknowledgements:

The article is prepared under the State Contract on Methods to Take into Account Transient Technological Processes in Mining Deep-Sated Mineral Deposits of Complex Structure, Topic No. 0405-2019-0005.

Issue number: 5
Year: 2021
Page number: 105-116
ISBN: 0236-1493
UDK: 622.271.332:624.131.537
DOI: 10.25018/0236_1493_2021_51_0_105
Article receipt date: 18.12.2020
Date of review receipt: 02.04.2021
Date of the editorial board′s decision on the article′s publishing: 10.04.2021
About authors:

Yakovlev A. V., Cand. Sci. (Eng.), Head of Laboratory of Open Geotechnology,
Shimkiv E. S., Researcher;
Institute of Mining, Ural Branch of RAS, Ekaterinburg, Ruusia, lubk_igd@mail.ru.

 

For contacts:
Bibliography:

1. Artemiev E. P. Deformatsionnye protsessy v blizhney zone zakonturnogo massiva pri massovykh vzryvakh na karierakh [Deformation processes in the near zone of the perimeter rock mass at large-scale blasts in open-pit mines], Geomekhanika v gornom dele, (Doklady Vserossiyskoy konf., October 10—11, 2007, Ekaterinburg), Institute of Mining of Ural Branch of RAS, Ekaterinburg, 2008, pp. 102 107 [in Russ].

2. Yakovlev V. L., Artemiev E. P., Batuev M. A., Dubskikh A. V. Influence of the order of initiation of borehole charges on the residual deformations of the rock mass, Gorny Zhurnal. 1996, no. 9/10, pp. 57 60 [in Russ].

3. Shevkun E. B., Leshchinsky A. V., Lysak Yu. A., Plotnikov A. Yu. Special aspects of blasting loosening at the increased delay intervals, MIAB. Mining Inf. Anal. Bull. 2017, no. 4, pp. 272 282 [in Russ].

3.   Shevkun E. B., Leshchinsky A. V., Lysak Yu. A., Plotnikov A. Yu. Blasting loosening of rocks in open-pit mines with long delays, MIAB. Mining Inf. Anal. Bull. 2020, no. 10, pp. 29 41 [in Russ].

5. Xiaodong Fu, Qian Sheng, Yonghui Zhang, Jian Chen. Application of the discontinuous deformation analysis method to stress wave propagation through a one-dimensional rock mass, International Journal of Rock Mechanics and Mining Sciences. 2015, Vol. 80, pp. 155 170.

6. Bangbiao Wua, Rong Chenc, Kaiwen Xia. Dynamic tensile failure of rocks under static pretension. International Journal of Rock Mechanics and Mining Sciences. Vol. 80, December 2015. pp. 12 18.

7. Yang L.-Y., Ding C.-X. Fracture mechanism due to blast-imposed loading under high static stress conditions. International Journal of Rock Mechanics and Mining Sciences. 2018, Vol. 107. pp. 150 158.

8. Brotanek I., Water J. Konturnoye vzryvaniye v gornom dele i stroitelstve [Presplit blasting in mining and construction], Moscow, Nedra, 1983, 144 p. [in Russ]

9. Fokin V. A. On the priority mechanism of split formation at presplit blasting. Izvestiya vuzov. Gorny Zhurnal, 2005, no. 6. pp. 78 86 [in Russ].

10. Fokin V. A. On breaking loads at brittle fracture by shear. Izvestiya vuzov. Gorny Zhurnal, 2004, no. 4. pp. 113 122 [in Russ].

11. Borychev V. M., Ilyakhin S. V., Bryukhovetskiy O. S. Influence of mining and technical factors on the choice of the value of overdrilling of borehole charges. Gornyi Zhurnal, 2018, no. 11, pp. 87 91 [in Russ].

12. Duan Y., Xiong D., Yao L., Wang F., Xu G. Advanced Technology for Satting Out of Blastholes and Measurement while Drilling. Rock Fragmentation by Blasting (Fragblast 11): Proceedings of the 11th International Symposium, Sydney, 2015. pp. 593 598.

13. Yakovlev A. V., Shimkiv E. C. Issledovaniye vliyaniya osnovnykh sistem treshchin v massive Severnogo kariera OAO “EVRAZ KGOK” na kachestvo drobleniya vzorvannoy gornoy massy [Investigation of the influence of the main systems of cracks in the rock mass of the Severny open-pit mine of JSC “EVRAZ KGOK” on the quality of crushing of the blasted rock mass], Problemy nedropolzovaniya. no. 3 (6) available at reviewed collection of scientific articles, Ekaterinburg, Institute of Mining of Ural Branch of RAS, 2015, no. 3, pp. 19 25 [in Russ].

14. Artemyev E. P. Upravleniye vozdeystviem vzryvnykh nagruzok na zakonturnyi massiv [Control of the impact of blasting loads on the perimeter rock mass], Uralsky gornopromyshlenny forum: sbornik dokladov, Ekaterinburg, Ural Branch of RAS, 2006, pp. 115 119 [in Russ].

15. Artemyev E. P. Deformatsionnye protsessy v blizhney zone zakonturnogo massiva pri massovykh vzryvakh na karierakh [Deformation processes in the near zone of the perimeter rock mass at large-scale blasts in open-pit mines], Geomekhanika v gornom dele: sbornik dokladov Vserossiyskoy konferentsii (October 10—11, 2007, Ekaterinburg), Institute of Mining of Ural Branch of RAS, Ekaterinburg, 2008, pp. 102 107 [in Russ].

16. Artemyev E. P., Yakovlev A.  V.,  Busargina  E.  S.,  Bushel  V.  G.,  Dubskikh A. V. Obespecheniye dolgovremennoy ustoychivosti vysokikh ustupov na predelnom konture karierov (na primere Zapadnogo kariera OAO “EVRAZ KGOK”) [Provision of long-term stability of high benches on the limiting outline of open-pit mines (on the example of the Zapadny open-pit mine of JSC “EVRAZ KGOK”)], Gorny Zhurnal, 2012, no. 1, pp. 52 55 [in Russ].

17. Artemyev E. P., Yakovlev A. V., Busargina E. С. Obosnovaniye prostransvennovremennogo poryadka initsiirovaniya skvazhinnykh zaryadov pri massovykh vzryvakh na karierakh [Justification of the spatial and temporal order of initiation of borehole charges at largescale blasts in open-pit mines], Problemy nedropolzovaniya: MIAB. Mining Inf. Anal. Bull., 2011, no. ОВ11, pp. 41 50 [in Russ].

18. Yakovlev A. V., Artemiev E. P., Tryaztsin A. V. Mathematical model of the spatial and temporal mode for crushing the rock masses by technological blasts using the multirow shortdelay blasting method, Markshederiya i nedropolzovaniye, 2015, no. 2, pp. 33 37 [in Russ].

Our partners

Подписка на рассылку

Раз в месяц Вы будете получать информацию о новом номере журнала, новых книгах издательства, а также о конференциях, форумах и других профессиональных мероприятиях.