Bibliography: 1. Soloviev G. I. Kasyanenko A. L., Nefedov V. E., Poddubny E. I. On the influence of the stiffness of the prodol-baltic grip on the stability of the arching grip of the excavation. Problemy gornogo davleniya. 2020, vol. 1, no. 38-39, pp. 47—56. [In Russ].
2. Le Q. P., Zubov V. P., Phung M. D. Improvement of the loading capacity of narrow coal pillars and control roadway deformation in the longwall mining system. A case study at Khe Cham Coal Mine (Vietnam). Inżynieria Mineralna. 2020, vol. 1, no. 2, pp. 115—122. DOI: 10.29227/ IM-2020-02-15.
3. Piven Yu. A., Vasyutina V. V., Kanin V. A. Improvement of the non-cellular ways of protection of preparatory mining excavations. Zhurnal teoreticheskoy i prikladnoy mekhaniki. 2022, no. 2 (79), pp. 60—65. [In Russ].
4. Malysheva N. N., Malisheva N. M. Influence of the time of entry into service of the security structure on the effectiveness of maintaining excavation in the mine «Rassvet-1». Metallurgiya i materialovedenie: Sbornik nauchnykh trudov GOU VPO LNR «DonGTU», 2020, no. 18, pp. 50—57.
5. Ignatov E. V. Status and main objectives of development of the long-stone development system at Kuzbass coal mines: A brief review. Journal of mining and geotechnical engineering. 2019, no. 4, pp. 30—49. [In Russ].
6. Golubev D. D. Razrabotka tekhnologiy vyemki pologikh plastov uglya, sklonnogo k samovozgoraniyu [Development of technologies for excavation of flat seams of coal prone to spontaneous combustion], Candidate’s thesis, Saint-Petersburg, SPGU, 2021, 22 p.
7. Liu Z. L., Ma Z. G., Li Y., Gong P., Li K. L., Liu W. A study on axial compression performance of large diameter-thickness ratio concrete-filled gas drainage steel pipe. Advances in Civil Engineering. 2021, vol. 2021, article 1479196. DOI: 10.1155/2021/1479196.
8. Gao Y., Liu D., Zhang X., He M. Analysis and optimization of entry stability in underground longwall mining. Sustainability. 2017, vol. 9, no. 11, article 2079. DOI: 10.3390/su9112079.
9. Fang Y., Liu C., Yang H., Yang L. Axial behaviour of concrete-filled corrugated steel tubular column embedded with structural steel. Journal of Constructional Steel Research. 2020, vol. 170, pp. 3—7. DOI: 10.1016/j.jcsr.2020.106064.
10. Ahmed M., Liang Q. Q., Patel V. I., Hadi M. N. Behavior of circular concrete-filled double steel tubular slender beam-columns including preload effects. Engineering Structures. 2020, vol. 220, pp. 322—366. DOI: 10.1016/j.engstruct.2020.111010.
11. Wang P., Ding L., Ma Y. J., Feng T., Sun G. J., Zhu Y. J., Zuo J. Wang P. et al. A case study on gob-side entry retaining technology in the deep coal mine of Xinjulong, China. Advances in Civil Engineering. 2020, vol. 2020, article 8849093. DOI: 10.1155/2020/8849093.
12. Zaydenvarg V. E., Sobolev V. V., Snytkin I. I. Tekhnologicheskie skhemy razrabotki plastov na ugol'nykh shakhtakh. Ch. 1 [Technological schemes of reservoir development in coal mines, part 1], Moscow, IGD im. A.A. Skochinskogo, 1991, 127 p.
13. Ahmed M., Liang Q. Q., Patel V. I., Hadi M. N. Numerical analysis of axially loaded circular high strength concrete-filled double steel tubular short columns. Thin-Walled Structures. 2019, vol. 138, pp. 105—116. DOI: 10.1016/j.tws.2019.02.001.
14. Zubov V. P., Kuang F. L. Development of resource-saving technology of mining flat coal seams with hard-to-cut roof rocks (by example of mines of Quang Ninh coal basin). Journal of Mining Institute. 2022, vol. 257, pp. 795—806. [In Russ]. DOI: 10.31897/pmi.2022.72.
15. Ning J., Wang J., Bu T., Hu S., Liu X. An innovative support structure for gob-side entry retention in steep coal seam mining. Minerals. 2017, vol. 7, no. 5, article 75. DOI: 10.3390/ min7050075.
16. Sui Y., Tu Y., Guo Q., Zhang J., Ke F. Study on the behavior of multi-cell composite T-shaped concrete-filled steel tubular columns subjected to compression under biaxial eccentricity. Journal of Constructional Steel Research. 2019, vol. 159 pp. 215—230. DOI: 10.1016/j. jcsr.2019.04.033.
17. Wang Z., Zhou X., Wei F., Li M. Performance of special-shaped concrete-filled square steel tube column under axial compression. Advances in Civil Engineering. 2020, vol. 2020. DOI: 10.1155/2020/1763142.
18. Xie S. R., Pan H., Chen D. D., Zeng J. C., Song H. Z., Cheng Q., Li Y. H. Stability analysis of integral load-bearing structure of surrounding rock of gob-side entry retention with flexible concrete formwork. Tunnelling and Underground Space Technology. 2020, vol. 103, article 103492. DOI: 10.1016/j.tust.2020.103492.
19. Gong P., Ma Z., Zhang R. R., Ni X., Liu F., Huang Z. Surrounding rock deformation mechanism and control technology for gob-side entry retaining with fully mechanized gangue backfilling mining: a case study. Shock and Vibration. 2017, vol. 2017, article 6085941. DOI: 10.1155/2017/6085941.
20. Gong P., Ma Z., Ni X., Zhang R. R. Floor heave mechanism of gob-side entry retaining with fully-mechanized backfilling mining. Energies. 2017, vol. 10, no. 12, article 2085. DOI: 10.3390/en10122085.
21. Luan H., Jiang Y., Lin H., Li G. Development of a new gob-side entry-retaining approach and its application. Sustainability. 2018, vol. 10, no. 2, article 0470. DOI: 10.3390/su10020470.
22. Yang J., He M., Cao C. Design principles and key technologies of gob side entry retaining by roof pre-fracturing. Tunnelling and Underground Space Technology. 2019, vol. 90, pp. 309—318. DOI: 10.1016/j.tust.2019.05.013.
23. Zhang G. C., Tan Y. L., Liang S. J., Jia H. G. Numerical estimation of suitable gob-side filling wall width in a highly gassy longwall mining panel. International Journal of Geomechanics. 2018, vol. 18, no. 8, p. 91. DOI: 10.1061/(ASCE)GM.1943-5622.0001217.
24. Xiao-Ming S., Gan L., Peng S., Chengyu M., Chengwei Z., Qi, L., Xing X. Application research on gob-side entry retaining methods in no. 1200 working face in Zhongxing mine. Geotechnical and Geological Engineering. 2019, vol. 37, pp. 185—200. DOI: 10.1007/s10706018-0602-z.
25. Belodedov A. A. Nauchnoe obosnovanie intensivnoy tekhnologii podzemnoy razrabotki tonkikh i sredney moshchnosti ugol'nykh plastov dlya kompleksnogo ispol'zovaniya dobyvaemogo syr'ya [Scientific substantiation of intensive technology of underground mining of thin and medium thickness of coal seams for the integrated use of extracted raw materials], Doctor’s thesis, Novocherkassk, YuRGPU (NPI), 2021, 40 p.
26. Ignatiev S. A., Sudarikov A. E., Imashev A. J. Modern mathematical methods for forecasting the conditions of maintaining and securing mining excavations. Journal of Mining Institute. 2019, vol. 238, pp. 371—375. [In Russ]. DOI: 10.31897/pmi.2019.4.371.
27. Zaydenvarg V. E., Sobolev V. V., Snytkin I. I. Tekhnologicheskie skhemy razrabotki plastov na ugol'nykh shakhtakh. Ch. 1-2 [Technological schemes of seam development at coal mines, part 1-2], Lyubertsy, IGD im. A.A. Skochinskogo, 1991, 333 p.
28. Kazanin O. I., Dolotkin Y. N., Skrylnikov I. N. Skrylnikov I. V. The use of security structures to maintain mine workings in coal mines. MIAB. Mining Inf. Anal. Bull. 2011, no. 1, pp. 34—39. [In Russ].
29. Protosenya A., Vilner M. Assessment of excavation intersections’stability in jointed rock masses using the discontinuum approach. Rudarsko-geološko-naftni Zbornik. 2022, vol. 38, no. 2, pp. 137—147. DOI: 10.17794/rgn.2022.2.12.
30. Sidorenko A. A., Dmitriev P. N., Alekseev V. Yu., Sidorenko S. A. Improvement of technological schemes of mining of coal seams prone to spontaneous combustion and rock bumps. Journal of Mining Institute. 2023, pp. 1—13. DOI: 10.31897/pmi.2023.37.
31. Gospodarikov A. P., Trofimov A. V., Kirkin A. P. P. Estimation of deformation characteristics of brittle rocks beyond the limit of strength in single axis servohydraulic loading. Journal of Mining Institute. 2022, vol. 256, pp. 539—548. [In Russ]. DOI: 10.31897/pmi.2022.87.
32. Karpov G. N., Kovalski E. R., Nosov A. A. Longwall recovery room erecting method for flat coal seam mining. MIAB. Mining Inf. Anal. Bull. 2022, no. 6-1, pp. 54—67. [In Russ]. DOI: 10.25018/0236_1493_2022_61_0_54.
33. Verbilo P., Karasev M., Belyakov N., Iovlev G. Experimental and numerical research of jointed rock mass anisotropy in a three-dimensional stress field. Rudarsko-geološko-naftni Zbornik. 2022, vol. 37, no. 2, pp. 109—122. DOI: 10.17794/rgn.2022.2.10.
34. Gospodarikov A. P., Zatsepin M. A., Vykhodtsev Ya. N., Nguen C. T. Numerical modeling of seismic wave impact on enclosing rock mass surrounding underground structures. MIAB. Mining Inf. Anal. Bull. 2022, no. 7, pp. 116—130. [In Russ]. DOI: 10.25018/0236_1493_2022_7_0_116.
35. Nikiforov A. V., Vinogradov E. A., Kochneva A. A. Analysis of multiple seam stability. International Journal of Civil Engineering and Technology. 2019, vol. 10, no. 2, pp. 1132—1139.