Justification of the optimal haulage distance for overburden transport to an in-pit (near-slope) dump considering pit slope stability

Determining the optimal haulage distance for transporting overburden to an in-pit (near-slope) dump in deep open pits, while accounting for pit slope stability, is an important task in deep mining. Reducing haulage distance by placing a dump on the non-working pit wall lowers operating costs, fuel consumption, and truck cycle time. However, locating the dump too close to the pit crest increases additional loading on the near-slope rock mass, changes its stress–strain state, and reduces the slope factor of safety. The optimal distance is therefore defined as a compromise between minimum unit transportation costs and compliance with regulatory stability requirements. The analysis considers the geometric parameters of the pit wall and the dump, dumped-rock density, dump height and stacking configuration, and rock-mass strength properties, including cohesion, internal friction angle, and unit weight. Verification was carried out by numerical modelling in the Rocscience software suite using limit equilibrium and finite element methods. The results make it possible to determine the minimum allowable dump setback distance and to justify an in-pit dumping scheme that satisfies both safety and economic efficiency requirements for feasibility studies and operational mine planning.

Keywords: deep open pit, in-pit dump, overburden, haulage distance, transportation distance, pit slope stability, factor of safety, additional load, potential failure prism, minimum allowable distance, numerical modeling, geomechanical constraints.
For citation:

Umarov F. Ya., Karimov Sh. V., Tuychiboev E. I., Norov D. Sh. Justification of the optimal haulage distance for overburden transport to an in-pit (near-slope) dump considering pit slope stability. MIAB. Mining Inf. Anal. Bull. 2026;(11-1):22-37. [In Russ]. DOI: 10.25018/0236_1493_2026_111_0_22.

Acknowledgements:
Issue number: 11-1
Year: 2026
Page number: 22-37
ISBN: 0236-1493
UDK: 622.271
DOI: 10.25018/0236_1493_2026_111_0_22
Article receipt date: 25.02.2026
Date of review receipt: 08.07.2026
Date of the editorial board′s decision on the article′s publishing: 20.10.2026
About authors:

F.Ya. Umarov1, Dr. Sci. (Eng.), Professor, Director, Scopus Author ID: 55827283800, e-mail: farkhodbek.umarov@yandex.ru,
Sh.V. Karimov1, PhD, Associate Professor, Head of the Sector for Research, Innovation, and Training of Academic and Pedagogical Personnel, e-mail: karimov20-13@mail.ru, ORCID ID: 0000-0002-8618-3703,
E.I. Tuychiboev1, Basic Doctoral Student, e-mail: tei050599@gmail.com, ORCID ID: 0009-0008-6089-7231,
D.Sh. Norov, Lecturer, Navoi Innovation University, 210100, Navoi, Republic of Uzbekistan, e-mail: norovd72@gmail.com,
1 Branch of the National University of Science and Technology «MISIS» in Almalyk, Almalyk, Republic of Uzbekistan.

 

For contacts:

Sh.V. Karimov, e-mail: karimov20-13@mail.ru.

Bibliography:

1. Thompson R. J. Mine haul road design and management: a review of current practice. Transactions of the Society for Mining, Metallurgy and Exploration. 2011, vol. 328, pp. 474—484.

2. Bazaluk O., Anisimov O., Saik P., Lozynskyi V., Akimov O., Hrytsenko L. Determining the safe distance for mining equipment operation when forming an internal dump in a deep open pit. Sustainability. 2023, vol. 15, no. 7, article 5912. DOI: 10.3390/su15075912.

3. Chand K., Koner R. Internal mine dump slope stability and failure zone identification using 3D modelling. Journal of Mining and Environment. 2023, vol. 14, pp. 1105—1119. DOI: 10.22044/jme.2023.13013.2360.

4. Chand K., Koner R. Failure zone identification and slope stability analysis of mine dump based on realistic 3D numerical modeling. Geotechnical and Geological Engineering. 2024, vol. 42, pp. 543—560. DOI: 10.1007/s10706-023-02588-1.

5. Jia L., Wang J., Cai X., Fang L., Ma Y., Wang Z. Study on morphology optimization of open-pit mine slope based on section and spatial morphology effect. Scientific Reports. 2024, vol. 14, article 2603. DOI: 10.1038/s41598-024-53227-5.

6. Wang S., Zhang Z., Wang C. Prediction of stability coefficient of open-pit mine slope based on artificial intelligence deep learning algorithm. Scientific Reports. 2023, vol. 13, article 12017. DOI: 10.1038/s41598-023-38896-y.

7. Lyu J., Hu T., Liu G., Cao B., Wang W., Li S. Stability evaluation of open-pit mine slope based on Bayesian optimization 1D-CNN. Scientific Reports. 2024, vol. 14, article 13995. DOI: 10.1038/s41598-024-64663-8.

8. Deng T., He J., Sun J., Peng S., Pang X., Chen T., Zhang X. Intelligent optimization of slope step parameters in open pit mines containing weak interbedded layers based on machine learning and multi-objective optimization methods. Frontiers in Earth Science. 2025, vol. 13, article 1666375. DOI: 10.3389/feart.2025.1666375.

9. Zhao H., Wei H., Qin B., Du H., Shao Z. Anti-sliding trenches to enhance slope stability of internal dumps on inclined foundations in open-pit coal mines. Applied Sciences. 2025, vol. 15, no. 19, article 10510. DOI: 10.3390/app151910510.

10. Luan B., Zhou W., Ao Z., Han Z., Xiao Y. Fuel-efficient road classification methodology for sustainable open pit mining. Applied Sciences. 2025, vol. 15, no. 11, article 6309. DOI: 10.3390/app15116309.

11. Thoeni K., Hartmann P., Berglund T., Servin M. Edge protection along haul roads in mines and quarries: A rigorous study based on full-scale testing and numerical modelling. Journal of Rock Mechanics and Geotechnical Engineering. 2025, vol. 17, no. 7, pp. 4020—4035. DOI: 10.1016/j.jrmge.2024.10.005.

12. Griffiths D. V., Lane P. A. Slope stability analysis by finite elements. Géotechnique. 1999, vol. 49, no. 3, pp. 387—403. DOI: 10.1680/geot.1999.49.3.387.

13. Bishop A. W. The use of the slip circle in the stability analysis of slopes. Géotechnique. 1955, vol. 5, no. 1, pp. 7—17. DOI: 10.1680/geot.1955.5.1.7.

14. Morgenstern N. R., Price V. E. The analysis of the stability of general slip surfaces. Géotechnique. 1965, vol. 15, no. 1, pp. 79—93. DOI: 10.1680/geot.1965.15.1.79.

15. Novozhenin S. Yu., Ilyukhin D. A., Fedorov T. S., Volkova J. A. Analysis of remote imaging of pitwall using interferometric radar technique. MIAB. Mining Inf. Anal. Bull. 2025, no. 10, pp. 97—111. [In Russ]. DOI: 10.25018/0236_1493_2025_10_0_97.

16. Protosenya A. G., Veselova A. V. Assessment of karst cave influence on ore body stability during development of Western Yakutia deposits. MIAB. Mining Inf. Anal. Bull. 2025, no. 1-1, pp. 33—46. [In Russ]. DOI: 10.25018/0236_1493_2025_11_0_33.

17. Bakhaeva S. P., Ananenko E. V. Substantiation of stability criteria for waste dump–foundation natural–technical system. MIAB. Mining Inf. Anal. Bull. 2025, no. 12-2, pp. 5—20. [In Russ]. DOI: 10.25018/0236_1493_2025_122_0_5.

18. Metodicheskie ukazaniya po opredeleniyu parametrov bortov i ustupov kar'erov, razrezov i otkosov otvalov [Methodological guidelines for determining the parameters of sides and ledges of quarries, sections and slopes of dumps], Мoscow, 2022, 80 p. 