Bibliography: 1. Bogachev A. F. Upravlenie zapasami gornoy massy i nadezhnost' raboty kar'era [Management reserves rock mass and reliability open pit], Moscow, Nedra, 1979, 200 p.
2. Fomin S. I., Ponomarev A. I., Shevelev V. A. Rationing of reserves ready for excavation during the formation of a quarry working area. Izvestiya Tul’skogo gosudarstvennogo universiteta, Nauki o zemle. 2012, no 2, pp. 176—183. [In Russ].
3. Fomin S. I., Chan Din' Bao, Bazarova E. I. Rationing of ore reserves according to the degree of preparedness for excavation in the design of open-cast mining. Marksheyderiya i nedropol'zovanie. 2017, no 2 (88), pp. 57—60. [In Russ].
4. Vokhmin S. A., Zagirov N. Kh., Kurchin G. S., Zaytseva E. V. On the issue of assessing the security of the Tashtagol mine with prepared and ready for excavation reserves. Marksheyderiya i nedropol'zovanie. 2014, no 3 (71), pp. 44—52. [In Russ].
5. Ivanov V. V. Determination of the optimal value of reserves ready for excavation in the open pit of complex structural carbonate deposits. Osvoenie mineral'nykh resursov Severa: problemy i resheniya. Vorkuta, 2008, pp. 112—116. [In Russ].
6. Peshkov A. A. Upravlenie razvitiem gornykh rabot na glubokikh kar'erakh [Deep open pit mining management], Moscow, IPKON RAN, 1999, 321 p.
7. Arsent'ev A. I. Gornye raboty v kar'erakh (osnovy teorii) [Mining operations in opin pit (theory basis)], Saint-Petersburg, 2006, 121 p.
8. Instruktsiya po opredeleniyu i uchetu vskrytykh, podgotovlennykh i gotovykh k vyemke zapasov poleznykh iskopaemykh na predpriyatiyakh MCHM SSSR [Instructions for the determination and accounting of discovered, prepared and ready for excavation of mineral reserves at enterprises of the USSR MFM], Belgorod, VIOGEM, 1974, 39 p. [In Russ].
9. Polovko A. M., Gurov S. V. Osnovy teorii nadezhnosti [Fundamentals of reliability theory], Saint-Petersburg, BKHV-Peterburg, 2006, 702 p. [In Russ].
10. Dzharlkaganov U. Mining development planning on a volume-discrete open pit model. Promyshlennost' Kazakhstana. 2011, no 5(68), pp. 89—93. [In Russ].
11. Metodicheskie ukazaniya po opredeleniyu normativov zapasov zheleznoy, khromitovoy rudy i ob"emov skal'noy vskryshi po stepeni podgotovlennosti k vyemke pri proektirovanii kar'erov Minchermeta SSSR [Guidelines for determining the standards for reserves of iron and chromite ore and rock overburden volumes according to the degree of preparedness for excavation when designing open pit of the USSR Ministry of Iron and Steel], Belgorod, VIOGEM, 1986, 9 p. [In Russ].
12. Metodicheskie ukazaniya po opredeleniyu i raschetu osnovnykh parametrov i pokazateley rabochey zony kar'era, kharakterizuyushchikh sostoyanie gornykh rabot [Guidelines for the determination and calculation of the main parameters and indicators of the working area of the open pit, characterizing the state of mining]. Rudnyy, AO «SSGPO», 1996, 8 p. [In Russ].
13. Akisa D. M., Mireku-Gyimah D. Application of surpac and whittle software in open pit optimisation and design. Ghana Mining Journal. 2015, vol. 15, no. 1, pp. 35—43.
14. Vallejo M. N., Dimitrakopoulos R. Stochastic orebody modelling and stochastic longterm production scheduling at the KéMag iron ore deposit, Quebec, Canada. International Journal of Mining, Reclamation and Environment. 2018, vol. 33, no. 1, pp. 1—18. DOI: 10.1080/17480930.2018.1435969.
15. Asad M. W. A., Qureshi M. A., Jang H. A review of cut-off grade policy models for open pit mining operations. Resources Policy. 2016, no. 49, pp. 142–152.
16. Githiria J., Musingwini C. Comparison of cut-off grade models in mine planning for improved value creation based on NPV. Society of Mining Professors. 6th Regional Conference. 2018. Johannesburg, South Africa, pp. 347—362.
17. Liu D., Li G., Hu N., Xiu G., Ma Z. Optimization of the cut-off grade for underground polymetallic mines. Gospodarka Surowcami Mineralnymi. 2019, vol. 35, no. 1, pp. 25—42. DOI: 10.24425/gsm.2019.128198.
18. Dimitrakopoulos R. Advances in applied strategic mine planning. Springer, 2018. 800 p.
19. Nelwamondo P., Kruger D. A project management approach for a mining. 3rd Young Professionals Conference Innovation Hub. Pretoria, 2017, pp. 263—276.
20. Castillo М. F. D., Dimitrakopoulos R. Dynamically optimizing the strategic plan of mining complexes under supply uncertainty. Resources Policy. 2019, no. 60, pp. 83—93.