Bibliography: 1. Efimov V. I., Hmelinskiy A. A., Mefod'ev S. N. Modern approaches to the layout of equipment for coal mining in shallow seams. Ugol'. 2019, no. 6, pp. 36—40. [In Russ]. DOI: 10.18796/0041-5790-2019-6-36-40.
2. Meshkov A. A., Volkov M. A., Ordin A. A., Timoshenko A. M., Botvenko D. V. On the record length and productivity of the stope at the mine named after V.D. Yalevsky. Ugol'. 2018, no. 7, pp. 4—7. [In Russ]. DOI: 10.18796/0041-5790-2018-7-4-7.
3. Kubrin S. S., Reshetnyak S. N., Bondarenko A. M. Impact of technology factors on specific power demands of equipment in extraction districts of coal mines. MIAB. Mining Inf. Anal. Bull. 2020, no. 2, pp. 161—170. [In Russ]. DOI: 10.25018/0236-1493-2020-2-0-161-170.
4. Fedorov G. S., Zhuravlev E. I. Calculation of the optimal energy parameters for the operation of the mining complex in various mining and geological conditions based on the simulation model of the shearer. MIAB. Mining Inf. Anal. Bull. 2016, no. 12, pp. 356—361. [In Russ].
5. Voronin V. A., Nepsha F. S. Simulation modeling of the electric drive of a cleaning combine for evaluation of energy efficiency indicators of the power supply system. Journal of Mining Institute. 2020, vol. 246, pp. 633—639. [In Russ]. DOI: 10.31897/ PMI.2020.6.5.
6. Jonek-Kowalska I., Turek M. Dependence of total production costs on production and infrastructure parameters in the Polish Hard Coal Mining Industry. Energies. 2017, vol. 10, no. 10, article 1480. DOI: 10.3390/en10101480.
7. Ordin A. A., Metelkov A. A. On the issue of optimizing the length and productivity of a complex-mechanized cleaning face of a coal mine. Fiziko-tekhnicheskiye problemy razrabotki poleznykh iskopayemykh. 2013, no. 2, pp. 100—112. [In Russ].
8. Babokin G. I. Influence of process flow diagram and longwall length on specific energy consumption of shearers. MIAB. Mining Inf. Anal. Bull. 2021, no. 2, pp. 139—149. [In Russ]. DOI: 10.25018/0236-1493-2021-2-0-139-149.
9. Plotnikov V. V. Conclusion of the formula for calculating the productivity of cleaning combines with a shtrekovym, drum or crown executive body. Ugol'. 2009, no. 9, pp. 47—55. [In Russ].
10. Babokin G. I., Shprekher D. M. Enhancement of energy efficiency in fully mechanized longwall mining. MIAB. Mining Inf. Anal. Bull. 2021, no. 9, pp. 122—134. [In Russ]. DOI: 10. 25018/0236_1493_2021_9_0_122.
11. Karpenko S. M., Karpenko N. V., Bezginov G. Yu. Forecasting of power consumption at mining enterprises using statistical methods. Russian Mining Industry. 2022, no. 1, pp. 82—88. [In Russ]. DOI: 10.30686/1609-9192-2022-1-82-88.
12. Stecula K., Brodny J., Tutak M. Informatics platform as a tool supporting research regarding the effectiveness of the mining machines work. CBU International Conference on Innovations in Science and Education. 2017, pp. 1215—1219.
13. Ning Wang, Zongguo Wen, Mingqi Liu, Jie Guo Constructing an energy efficiency benchmarking system for coal production. Applied Energy. 2016, vol. 169, pp. 301—308. DOI: 10. 1016/j.apenergy.2016.02.030.
14. Acarnley P. P., Watson J. F. Review of position-sensorless operation of brushless permanent-magnet machines. IEEE Transactions on Industrial Electronics. 2006, vol. 53, no. 2, pp. 352—362. DOI: 10.1109/TIE.2006.870868.
15. Shi J. G., Mao J., Wei X. H. Research on dynamic tension control theory for heavy scraper conveyor. Applied Mechanics and Materials. 2010, vol. 34–35, pp. 1956—1960. DOI: 10.4028/ www.scientific.net/AMM.34-35.1956.
16. Ning Wang, Zongguo Wen, Mingqi Liu, Jie Guo Constructing an energy efficiency benchmarking system for coal production. Applied Energy. 2016, vol. 169, pp. 301—308. DOI: 10.1016/j.apenergy.2016.02.030.