Field data analysis in construction of escalator tunnels at Obvodny Kanal and Admiralteyskaya Stations of the Saint-Petersburg Metro using tunnel boring machine

In 2009–2011 in the Saint-Petersburg Metro, two escalator tunnels were constructed using tunnel boring machine (TBM) at the stations Obvodny Kanal (October–December 2009) and Admiralteyskaya (January–April 2011). Those were respectively the second and third escalator tunnels constructed using TBM under loading of soil in the world (the first experience was gained in inclined heading in construction of the Marina Roshcha Station in the Moscow Metro). This article discusses heading of escalator tunnels. The field data were obtained by Lenmetrogiprotrans Research, Survey and Design Institute during geotechnical monitoring. The emphasis was laid on the influence of the tunneling technology on ground surface subsidence. The time curves of ground surface subsidence were plotted, and the subsidence trough draft by the end of geotechnical monitoring was drawn. The time–displacement curves were plotted by the readings of underground extensometers. The heading phases of the highest effect on ground surface subsidence are analyzed separately: loading generated by soil mass on the heading face and injection of grouting mortar in-between soil and casing. The subsidence monitoring duration is assessed. The subsidence flow chart subject to the adopted heading technology is proposed.

Keywords: escalator tunnel, subsidence trough, grouting, soil-generated load, field data, geotechnical monitoring.
For citation:

Kostenko B. V., Larionov R. I. Field data analysis in construction of escalator tunnels at Obvodny Kanal and Admiralteyskaya Stations of the Saint-Petersburg Metro using tunnel boring machine. MIAB. Mining Inf. Anal. Bull. 2021;(9):48-64. [In Russ]. DOI: 10.25018/0236_1493_2021_9_0_48.

Acknowledgements:
Issue number: 9
Year: 2021
Page number: 48-64
ISBN: 0236-1493
UDK: 624.121.542
DOI: 10.25018/0236_1493_2021_9_0_48
Article receipt date: 22.12.2020
Date of review receipt: 16.01.2021
Date of the editorial board′s decision on the article′s publishing: 10.08.2021
About authors:

B.V. Kostenko1, Engineer, e-mail: polo_olop@mail.ru; Graduate Student, Saint-Petersburg Mining University, 199106, Saint-Petersburg, Russia,
R.I. Larionov1, Head of Laboratory, Engineer, e-mail: roman.larionov.spmi@gmail.com,
1 «Scientific, Research, Design and Surveying Institute «Lenmetrogiprotrans» OSC, 191002, Saint-Petersburg, Russia.

For contacts:

B.V. Kostenko, e-mail: polo_olop@mail.ru.

Bibliography:

1. Maslak V. A., Bezrodnyy K. P., Markov V. A. Technologies of constructing subway in the historical centre of Saint-Petersburg with small ground settlements. Metro i tonneli. 2012, no. 6, pp. 26—29. [In Russ].

2. Shtern G. Ya., Sorokin N. A. Construction of escalator tunnel in Moscow with TBM «Lovat». Metro i tonneli. 2009, no. 2, pp. 6—7. [In Russ].

3. Bezrodnyy K. P., Lebedev M. O. Field investigations of stress-stain state of the system «lining-soil mass». Metro i tonneli. 2011, no. 6, pp. 28—30. [In Russ].

4. Bezrodnyy K. P., Lebedev M. O. Mining and environmental monitoring as a tool for understanding the geomechanical processes during the construction of subway. Metro i tonneli. 2016, no. 3, pp. 10—11. [In Russ].

5. Hyunku Park, Ju-Young Oh, Dohyung Kim, Seokbue Chang Monitoring and analysis of ground settlement induced by tunneling with slurr pressure-balanced tunnel boring machine. Advances in Civil Engineering. 2018, vol. 2018, pp. 10. DOI: 10.1155/2018/5879402.

6. Dongyang Geng, Karel Vojtasik. Measured analysis of ground settlement deformation of underground tunnel. IOP Conference Series: Earth and Environmental Science. 2019, vol. 310, no. 2, article 022063. DOI: 10.1088/1755-1315/310/2/022063.

7. Bezrodnyy K. P., Lebedev M. O., Egorov G. D. Construction of escalator tunnels in SaintPetersburg. Metro i tonneli. 2015, no. 1, pp. 14—17. [In Russ].

8. El-Nahhas F. M., El-Mossallamy Y. M., El-Shamy A. A. 3D analysis of ground settlement induced by mechanized tunneling. The Fourteenth International Conference on Structural and Geotechnical Engineering ICSGE 14, Ain Shams University. 2015. Session 11, Paper No. 3

9. Podakov V. F. Posobie po proektirovaniyu meroproyatiy dlya zashchity ekspluatituemykh zdaniy i sooruzheniy ot vliyaniya gornoprokhodcheskikh rabot pri stroitel’stve metropolitena [Scientific guide to design protection of buildings and structures from subway tunneling]. Leningrad, Stroyizdat, 1973, 58 p.

10. Koukoutas S. P., Sofianos A. I. Settlements due to single and twin tube urban EPB shield tunneling. Geotechnical and geological engineering. 2015, vol. 33, pp. 487—510.

11. Binh Thanh Le, Minoru Kuriki, Quoc Phan An empirical analysis on measured ground surface settlement induced by TBM tunneling in Ho Chi Minh city. Geotechnics for Sustainable Infrastructure Development. 2020, pp. 305—306. DOI: 10.1007/978-981-15-2184-3_38.

12. Gulielmetti V., Grasso P., Mahtaba A. Mechanized tunneling in urban areas. Turin, Italy, «Geodata S.p.A.», 2013.

13. Masein S. V., Prudnikov A. D., Lekht V. V. Planning solutions for surface settlement minimize using earth pressure balance shield. Metro i tonneli. 2016, no. 3, pp. 6—9. [In Russ].