Bibliography: 1. Cocker М. D., Orris G. J. World potash developments. Proceedings of the 48th Annual Forum on the Geology of Industrial Minerals. Ch. 1. Scottsdale, 2015. Pp. 1—16.
2. Jie C., Liu J.-X., Jiang D.-Y., Fan J.-Y., Ren S. An experimental study of strain and damage recovery of salt rock under confining pressures. Rock and Soil Mechanics. 2016. Vol. 37. No 1. Pp. 105—112.
3. Feng G. R., Wang P. F., Chugh Y. P. A new gob-side entry layout for longwall top coal caving. Energies. 2018. Vol. 11. No 5. P. 1292.
4. Wang P. F., Feng G. R., Zhao J., Wang Z. Improving stress environment in development entries through an alternate longwall mining layout. Arabian Journal of Geosciences. 2018. Vol. 11. No 2. P. 44.
5. Zubov V. P., Smychnik A. D., Kirienko V. M., Pleskunov V. N. Patent BY 9409, 30.06.2007.
6. Kalinichenko P. I., Petrovskiy B. I., Tarakanov V.A., Petrovskiy A. B., Petrovskiy Yu. B. Patent BY 17776, 30.12.2013.
7. Prushak V. Ya., Shcherba V. Ya., Karaban' D. T., Kalinichenko P. I., Petrovskiy B. I., Petrovskiy A. B., Petrovskiy Yu. B., Misnikov V.A., Kalinichenko I. N. Patent BY 18033, 28.02.2014.
8. Petrovskiy B. I., Misnikov V.A., Shamanin A. V., Petrovskiy A. B., Sanikovich A. N. Instruktsiya po primeneniyu sistem razrabotki na Starobinskom mestorozhdenii [Instructions for the use of development systems at the Starobinskoye field], Soligorsk, 2018, 146 p. [In Russ].
9. Pravila po obespecheniyu promyshlennoy bezopasnosti pri razrabotke podzemnym sposobom solyanykh mestorozhdeniy Respubliki Belarus' [Rules for ensuring industrial safety in underground mining of salt deposits of the Republic of Belarus], Soligorsk-Minsk, 2017. [In Russ].
10. Zubov V. P. Applied technologies and current problems of resource-saving in underground mining of stratified deposits. Gornyi Zhurnal. 2018, no 6, pp. 77—83. [In Russ]. DOI: 10.17580/ gzh.2018.06.16.
11. Demin V. F., Portnov V. S., Demina T. V., Zhumabekova A.Ye. Studying stress-strain state of border carbon massif around mine working with roof bolting. Ugol'. 2019, no 7, pp. 72—77. [In Russ]. DOI: 10.18796/0041-5790-2019-7-72-77.
12. Demin V. F., Demina T. V., Kaynazarov A. S., Kaynazarova A. S. Evaluation of the workings technological schemes effectiveness to increase the stability of their contours. Sustainable development of mountain territories. 2018. Vol. 10, no 4, pp. 606—617. [In Russ]. DOI: 10.21177/1998-4502-2018-4-606-616.
13. Tereshchuk R. N., Naumovich A. V. Obespechenie ustoychivosti podgotovitel'nykh vyrabotok glubokikh ugol'nykh shakht: Monografiya [Ensuring the stability of preparatory workings of deep coal mines: Monograph], Dnepropetrovsk, NGU, 2015, 134 p.
14. Sokol D. G. Principal directions of the development of mining methods for potash seams. Vestnik Kuzbasskogo gosudarstvennogo tekhnicheskogo universiteta. 2018, no 4, pp. 93–94. [In Russ]. DOI: 10.26730/1999-4125-2018-4-93-98.
15. Instruktsiya po okhrane i krepleniyu gornykh vyrabotok na Starobinskom mestorozhdenii [Instructions for protecting and securing mine workings at the Starobinskoye field], SoligorskMinsk, 2010, 125 p. [In Russ].
16. Prushak V. Ya., Scherba V.Ya. Technological schemes of potash seams pillarless mining under difficult geo-logical and mining condition. Annual of the University of mining and geology «St. Ivan Rilski», 2012, Vol. 55, Part II. Mining and Mineral processing, pp. 10—15.
17. Petlovanyi M. V., Lozynskyi V. H., Saik P. B., Sai K. S. Modern experience of low-coal seams underground mining in Ukraine. International Journal of Mining Science and Technology. 2018. Vol. 28. No 6. DOI: 10.1016/j.ijmst.2018.05.014.